Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 124 | $531.0M |
| R.S. Audley Inc. | 31 | $444.9M |
| Continental Paving Inc. | 85 | $379.7M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Vanasse Hangen Brustlin Inc. | 35 | $67.7M |
| Severino Trucking Co Inc. | 1 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,626 | $4.37B |
| other | 1,501 | $3.47B |
| grant | 218 | $291.9M |
| transfer | 179 | $321.0M |
| nomination | 118 | $109.2M |
| lease | 111 | $25.7M |
| amendment | 111 | $360.3M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 12 | $5.7M |
| settlement | 4 | $5.0M |
| expenditure | 3 | $151,754 |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 06/20/18 | #58 | Authorize the Bureau of Construction to enter into a contract with A.J. Cameron Sod Farm Inc., Farmington, NH, for establishing Lilac beds along roadways throughout the State utilizing funds through t | A.J. Cameron Sod Farm Inc. | $59,650 | approved |
| 06/20/18 | #59 | Authorize the Bureau of Construction to enter into a contract with Pine Ridge Technologies Inc., Wakefield, MA, for retrofitting all signal head backplates at 184 intersections throughout the state wi | Pine Ridge Technologies Inc. | $484,801 | approved |
| 06/20/18 | #60 | Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t | R&R Communication Inc. | $178,625 | approved |
| 06/20/18 | #60A | Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi | Vanasse Hangen Brustlin Inc. | $3.0M | approved |
| 06/20/18 | #60B | Authorize the Bureau of Right of Way to enter into a contract with Innovision Realty Group LLC, Goffstown, NH, for the management of properties throughout the State, in the amount of $478,776.32. (2)F | Innovision Realty Group LLC | $478,776 | approved |
| 06/20/18 | #60C | Authorize the Bureau of Construction to enter into a contract with Evroks Corporation Inc., Northfield, NH, for furnishing and installing debris shielding and or debris netting on 15 bridges statewide | Evroks Corporation Inc. | $1.6M | approved |
| 06/06/18 | #26 | Authorize the Bureau of Right of Way to sell four tracts of State owned land totaling 49,460+/- square feet (1.14 +/- Acres) to the following entities: 6,500 +/- square foot parcel to Corner of New Ho | $250,000 | approved | |
| 06/06/18 | #27 | Authorize the Bureau of Turnpikes to enter into a contract with TNT Electrical Contractor LLC, Laconia, NH, for electrical services at facilities maintained by the Bureau of Turnpikes, on the basis of | TNT Electrical Contractor LLC | $67,375 | approved |
| 06/06/18 | #28 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a contract with Tilson Technology Management Inc., Portland, ME, for the purpose of providing Statewide Intelligent | Tilson Technology Management I | $253,130 | approved |
| 06/06/18 | #29 | Authorize the Bureau of Environment to enter into an agreement with the firm of Hoyle, Tanner & Associates Inc., Manchester, NH, for on-call environmental documentation and permitting support services | firm of Hoyle, Tanner & Associ | $400,000 | approved |
| 06/06/18 | #30 | Authorize the Bureau of Environment to enter into three pre-qualified, low bid, cost-based agreements for a combined total of $600,000 with the following firms: (1) Northeast Archaeology Research Cent | $600,000 | approved | |
| 06/06/18 | #31 | Authorize the Bureau of Bridge Design to enter into an agreement with Hoyle, Tanner & Associates Inc., Manchester, NH, for on-call engineering services for complex bridge inspection and ratings, and e | Hoyle, Tanner & Associates Inc | $750,000 | approved |
| 06/06/18 | #32 | Authorize the Bureau of Right of Way to pay property owners $36,880 as documented in the Contemplated & Damage Awards List for amounts greater than $5,000 for the period extending from April 20, 2018 | $36,880 | approved | |
| 06/06/18 | #33 | Authorize the Bureau of Right of Way to sell a 3,250 +/- square foot parcel of State owned land located on the easterly side of NH Route 125 in the Town of Barrington to Wayne and Jennifer Brulotte fo | $6,000 | approved | |
| 06/06/18 | #34 | Authorize the Bureau of Environment to continue to make payments to the Department of Environmental Services (originally approved by G&C on 11-18-16, item #28) for permit application fees, and in lieu |
approved
Wheeler
|
||
| 06/06/18 | #35 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for roadway rehabilitation project that will improve the pavement condition of approximately 7.3 m | Pike Industries Inc. | $4.5M | approved |
| 06/06/18 | #36 | Authorize the Bureau of Construction to enter into a contract with Annseal Inc., Johnson City, NY, for pavement preservation/crack sealing on Tier 1 roadways; a 23 miles section of I-93 in the Towns o | Annseal Inc. | $583,669 | approved |
| 06/06/18 | #37 | Authorize the Bureau of Construction to enter into a contract with The Gorman Group LLC, Albany, NY, for pavement preservation on I-89, beginning south of Exit 7 and extending northerly to just south | Gorman Group LLC | $1.6M | approved |
| 06/06/18 | #38 | Authorize the Bureau of Construction to enter into a contract with The Gorman Group LLC, Albany, NY, for pavement preservation of eight Tier 2 roadway segments in the Counties of Belknap, Grafton, Hil | Gorman Group LLC | $4.8M | approved |
| 06/06/18 | #39 | Authorize the Bureau of Construction to enter into a contract with Brox Industries Inc., Albany, NY, for pavement preservation, rehabilitation and maintenance of eleven Tier 2 roadway segments in the | Brox Industries Inc. | $4.8M | approved |
| 06/06/18 | #40 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Southwestern Community Services Inc., Keene, NH (originally approved by G&C on 7-7-17, item #38), for coordinated transpo | $484,564 | approved | |
| 06/06/18 | #41 | Authorize the Bureau of Rail & Transit to enter into a contract with Community Volunteer Transportation Company, Peterborough, NH, for coordinated transportation services for seniors and individuals w | Community Volunteer Transporta | $51,631 | approved |
| 06/06/18 | #42 | Authorize the Bureau of Rail & Transit to enter into an agreement with Cooperative Alliance for Seacoast Transportation, Dover, NH, for coordinated transportation services for seniors and individuals | Cooperative Alliance for Seaco | $132,808 | approved |
| 06/06/18 | #43 | Authorize the Bureau of Rail & Transit to enter into a bridge contract with the State of Maine and the Boston and Maine Corporation’s Springfield Terminal Railway Company, to provide for the restorati | approved | ||
| 06/06/18 | #44 | Authorize the Bureau of Rail & Transit to enter into an agreement with Concord Coach Lines Inc., Concord, NH, for intercity bus service from Berlin, North Conway, and Littleton to Concord, NH, for an | Concord Coach Lines Inc. | $309,000 | approved |
| 06/06/18 | #45 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Upper Valley Lake Sunapee Regional Planning Commission, Lebanon, NH (originally approved by G&C on 6-7-17, item #29), for | $461,722 | approved | |
| 06/06/18 | #46 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Mount Washington Valley Economic Council Inc., Conway, NH (originally approved by G&C on 6-7-17, item #27), for coordinat | $185,016 | approved | |
| 06/06/18 | #47 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Southern NH Planning Commission, Manchester, NH (originally approved by G&C on 6-7-17, item #26), for coordinated transpo | $456,472 | approved | |
| 06/06/18 | #48 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Greater Derry-Salem Cooperative Alliance for Regional Transportation, Londonderry, NH (originally approved by G&C on 6-7- | $237,744 | approved | |
| 06/06/18 | #49 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Nashua Regional Planning Commission, Merrimack, NH (originally approved by G&C on 6-7-17, item #24), for coordinated tran | $289,582 | approved | |
| 06/06/18 | #50 | Authorize the Bureau of Highway Maintenance to exercise a contract renewal option with Travelers Marketing LLC, Wellesley, MA (originally approved by G&C on 5-27-15, item #40), for the Motor Safety Pa | $171,300 | approved | |
| 06/06/18 | #51 | Authorize the Bureau of Highway Design to amend a contract with McFarland-Johnson Inc., Concord, NH, and Binghamton, NY (originally approved by G&C on 11-20-13, item #123), to prepare the second phase | McFarland-Johnson Inc. | $1.7M | approved |
| 06/06/18 | #52 | Authorize the Bureau of Planning and Community Assistance to enter into an agreement with the Town of Merrimack, to provide funding and services under the Federal Municipal-Owned Bridge Rehabilitation | Town of Merrimack | $3.7M | approved |
| 06/06/18 | #53 | Authorize the Bureau of Bridge Design to amend a sole source contract with Vanasse Hangen Brustlin Inc., Bedford, NH (originally approved by G&C on 8-26-15, item #30), to study and prepare preliminary | Vanasse Hangen Brustlin Inc. | $1.0M | approved |
| 05/16/18 | #14 | Authorize the Bureau of Right of Way to pay property owners $321,128.25 as documented in the Contemplated & Damage Awards List for amounts greater than $5,000 for the period extending from April 10, 2 | $321,128 | approved | |
| 05/16/18 | #15 | Authorize the Bureau of Right of Way to pay property owners $21,278.35 as documented in the Contemplated & Damage Awards List for amounts greater than $5,000 for the period extending from March 15, 20 | $21,278 | approved | |
| 05/16/18 | #16 | Authorize the Bureau of Turnpikes to transfer funds in the amount of $42,100 in State Fiscal Year 2018. Effective upon G&C approval through June 30, 2018. 100% Turnpike Funds. Contingent upon Fiscal C | $42,100 | approved | |
| 05/16/18 | #17 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for pavement rehabilitation along 2.2 miles of NH 101/I-293 from the intersection of NH 114 | Continental Paving Inc. | $4.2M | approved |
| 05/16/18 | #18 | Authorize the Bureau of Construction to enter into a contract with L&D Safety Markings Corp., Barre, VT, for placement of 2.2 million feet of pavement markings during the spring/summer of 2018 along a | L&D Safety Markings Corp. | $326,120 | approved |
| 05/16/18 | #19 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for pavement preservation and rehabilitation of eight Tier 2 roadway segments (NH 101, NH 12, US 2 | Pike Industries Inc. | $4.7M | approved |
| 05/16/18 | #19A | Authorize the Bureau of Turnpikes to transfer funds in the amount of $600,000 from the Turnpike General Reserve Account to budget and expend revenue for E-ZPass credit card transaction fees for the Di | $600,000 | approved | |
| 05/02/18 | #27 | Authorize the Division of Operations to accept and expend revenue in the amount of $138,329 from the National Fish and Wildlife Foundation for a grant to improve a road-stream crossing in Stratford to | $138,329 | approved | |
| 05/02/18 | #28 | Authorize to enter into a contract with Terracon Consultants Inc., Manchester, NH, for the Underwater Inspection of various bridges in NH, for an amount not to exceed $175,000. Effective upon G&C appr | Terracon Consultants Inc. | $175,000 | approved |
| 05/02/18 | #29 | Authorize the Bureau of Construction to enter into a contract with J. Hutchins Inc., Richmond, VT, for resurfacing of approximately 53 miles in District I in Coos County, on the basis of a low bid of | J. Hutchins Inc. | $4.1M | approved |
| 05/02/18 | #30 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 20 miles in District III in Belknap, Grafton and Merrimack | Continental Paving Inc. | $2.0M | approved |
| 05/02/18 | #31 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 50 miles in District III in Carroll and Strafford Counties | Continental Paving Inc. | $3.4M | approved |
| 05/02/18 | #32 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 57 miles in District II in Grafton, Merrimack and Sullivan | Continental Paving Inc. | $3.8M | approved |
| 05/02/18 | #33 | Authorize the Bureau of Construction to enter into a contract with Lane Construction Corp., Cheshire, CT, for resurfacing of approximately 73 miles in District IV in Cheshire, Hillsborough and Sulliva | Lane Construction Corp. | $5.2M | approved |
| 05/02/18 | #34 | Authorize the Bureau of Environment to enter into an agreement with McFarland-Johnson Inc., Concord, NH, for on-call environmental documentation and permitting support services for various projects an | McFarland-Johnson Inc. | $400,000 | approved |
| 05/02/18 | #35 | Authorize the Bureau of Highway Design to enter into an agreement with GM2 Associates Inc., Concord, NH, for preliminary design services for the reconstruction of the unimproved 1.7 mile segment of NH | GM2 Associates Inc. | $1.7M | approved |