← All Vendors

Weaver Bros. Construction Co. Inc.

5 items $18.2M total value Bow, NH 10/17/12 – 10/17/18
Top Departments
Department Items Total
DEPARTMENT OF TRANSPORTATION 5 $18.2M
Item Types
Type Count Total Value
contract 5 $18.2M
Items
Date Item Department Description Type Amount Outcome
10/17/18 #8 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Construction to enter into a retroactive contract with Weaver Bros. Construction Co., Inc., Bow, NH, for emergency roadway repair located on NH 118 in Warren, on the basis of a contract $2.3M approved
08/22/18 #20 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Construction to enter into a contract with Weaver Bros. Construction Co., Inc., Bow, NH, for widening NH 106 from 800’ south of Mudgett Hill Road to 1,400’ north of the NH Moto contract $2.6M approved
11/18/16 #38 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Construction to enter into a contract with Weaver Bros. Construction Co., Inc., Bow, NH, for replacing a deteriorated 9’ by 5’ reinforced concrete box culvert carrying NH Route contract $669,520 approved
08/03/16 #23 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Construction to enter into a contract with Weaver Bros. Construction Co., Inc., Bow, NH, for pavement preservation from North Main Street to the end of I-393 in the City of Con contract $10.6M approved
10/17/12 #98 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Construction to enter into a contract with Weaver Bros. Construction Co., Inc., Concord, NH, for installation of median barrier at a number of locations on Interstate 93 interc contract $1.9M approved