All Items
32,782 items
| Date | # | Description | Amount | Vote |
|---|---|---|---|---|
| 05/03/17 | 103 | Authorize to extend the temporary full-time position of Supervisor VII in the DAS Bureau of Facilities and Assets Management from June 7, 2017 to June 7, 2018. 100% Other Funds. | approved | |
| 05/03/17 | 104 | Authorize to enter into a contract with Enhanced Communications of Northern New England, d/b/a Fairpoint Inc., Manchester, NH (originally approved by G&C on 5-23-12, item #23C and expires 5-9-17), for | $2.8M | approved |
| 05/03/17 | 105 | Authorize the Division of Public Works Design and Construction to enter into a memorandum of agreement with the Public Utilities Commission to utilize $276,808 of renewable energy funds to install a p | $45.8M | approved |
| 05/03/17 | 106 | Authorize the Division of Public Works Design and Construction to enter into a contract with D.L. King and Associates Inc., Nashua, NH, for the construction of a highway maintenance facility in Salem, | $3.8M | approved |
| 05/03/17 | 107 | Authorize the Division of Public Works Design and Construction to enter into a contract with Charters Brothers Construction LLC, Danville, NH, for the Adjutant General Department’s NH Army National Gu | $1.0M | approved |
| 05/03/17 | 108 | Authorize the Division of Public Works Design and Construction to enter into a contract with D. L. King and Associates Inc., Nashua, NH, for the Dolloff Building ADA Restrooms and Entryway, State Offi | $359,140 | approved |
| 05/03/17 | 109 | Authorize the Division of Public Works Design and Construction to enter into a contract with Gerard A. Laflamme Inc., Londonderry, NH, for the NH State House Improvements – Electrical, Concord, NH, fo | $201,000 | approved |
| 05/03/17 | 11 | Authorize to enter into an agreement with the University of NH, Durham, NH for the provision of a predictive model for Lyme disease and evaluation of environmental risk factors associated with Lyme di | $62,981 | approved |
| 05/03/17 | 110 | Authorize the Division of Public Works Design and Construction to enter into a contract with Hascall and Hall Inc., Portland, ME, for the State House Parapet Repointing and Other Repairs, Concord, NH, | $352,677 | approved |
| 05/03/17 | 12 | Authorize to enter into an agreement with K. Kirkwood Consulting LLC, Manchester, NH, to provide Lead-Safety Renovation, Repair, and Painting Trainings, in an amount not to exceed $50,000. Effective u | $50,000 | approved |
| 05/03/17 | 13 | Authorize to pay various approved proficiency vendors for proficiency testing programs that are currently required and for other proficiency testing that may become necessary, in an amount estimated a | $81,165 | approved |
| 05/03/17 | 14 | Authorize to exercise a renewal option and amend three existing contracts with the vendors as detailed in letter dated April 11, 2017 (originally approved by G&C on 8-24-16, item #10A, 10-5-16, item # | $545,152 |
approved
Wheeler
|
| 05/03/17 | 14A | TABLED – The Governor and Council on motion of Councilor Wheeler, seconded by Councilor Prescott, voted to table the request to enter into an agreement with Harbor Homes Inc., Nashua, NH, for the prov | $2.9M |
approved
Wheeler
|
| 05/03/17 | 15 | Authorize to enter into a sole source amendment with Scientific Technologies Corporation, Scottsdale, AZ (originally approved by G&C on 4-23-14, item #39A), to provide system enhancements to improve t | $1.5M |
approved
Wheeler
|
| 05/03/17 | 16 | Authorize the Division of Operations to transfer $347,800 between various accounts and classes. Effective upon G&C approval through June 30, 2017. Fiscal Committee approved. | $347,800 | approved |
| 05/03/17 | 17 | Authorize to accept and place on file the Bureau of Finance and Contracts’ report of all paid Small Claims in the previous third quarter of FY 2017 totaling $2,809 for individual amounts less than $60 | $2,809 | approved |
| 05/03/17 | 18 | Authorize the Bureau of Highway Design to retroactively enter into a memorandum of agreement with the Maine Department of Transportation, Augusta, ME, for transferring obligation authority to fulfill | $37,250 | approved |
| 05/03/17 | 19 | Authorize to accept and place on file the Bureau of Right of Way’s Contemplated Awards List for amounts less than $5,000 for the sum total of $68,707.09 for the period extending from January 1, 2017 t | $68,707 | approved |
| 05/03/17 | 20 | Authorize the Bureau of Right of Way to pay property owners $7,125 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from March 23, 2017 through Ap | $7,125 | approved |
| 05/03/17 | 21 | Authorize the Bureau of Highway Design and the Department of Environmental Services to retroactively enter into a memorandum of agreement for water supply land conservation grants to permanently prote | $2.7M | approved |
| 05/03/17 | 22 | Authorize the Office of Federal Compliance to enter into a contract with Hessel and Associates LLC, Brattleboro, VT, based on a single bid received in a low bid process, for a total fee of $54,186, to | $54,186 | approved |
| 05/03/17 | 23 | Authorize the Office of Federal Compliance to enter into a contract with Hessel and Associates LLC, Brattleboro, VT, based on a single bid received in a low bid process, for a total fee of $28,456, to | $28,456 | approved |
| 05/03/17 | 24 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing approximately 20 miles along the F.E. Everett Turnpike, as well as to const | $2.8M | approved |
| 05/03/17 | 25 | Authorize the Bureau of Construction to enter into a contract with B.U.R. Construction LLC, Belmont, NH, for bridge rehabilitation work on NH Route 25 over the Connecticut River in the Towns of Piermo | $318,947 | approved |
| 05/03/17 | 26 | Authorize the Bureau of Construction to enter into a contract with New England Signal Systems Inc., Northwood, NH, for the repair of four existing traffic signal systems, located in four different tow | $235,319 | approved |
| 05/03/17 | 27 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 60 miles in District VI in Merrimack, Rockingham and Straf | $4.5M | approved |
| 05/03/17 | 28 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 32 miles in District III in Belknap, Grafton and Merrimack | $2.3M | approved |
| 05/03/17 | 29 | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC, Belmont, NH, for improvements to approximately 630’ of Main Street in Enfield at the Northern Rail Trail underpass j | $255,619 | approved |
| 05/03/17 | 3 | NOT USED | not_used | |
| 05/03/17 | 30 | Authorize to accept and place on file the Bureau of Construction’s quarterly summary of projects that may require contingency use for the period through March 28, 2017. | approved | |
| 05/03/17 | 31 | Authorize the Bureau of Rail and Transit to enter into sole source complementary contract agreements with HB Software Solutions Inc., in the amount of $108,080 and Coordinated Transportation Solutions | $182,880 | approved |
| 05/03/17 | 31A | Authorize the Bureau of Construction to enter into a contract with Mitchell Sand & Gravel LLC, Shelburne, MA, for resurfacing of approximately 70 miles in District IV in Cheshire and Hillsborough Coun | $4.6M | approved |
| 05/03/17 | 31B | Authorize the Bureau of Construction to enter into a contract with SUR Construction Inc., Rochester, NH, for a two-way left turn lane on NH Route 11 in Farmington for the entire length of the project, | $1.4M | approved |
| 05/03/17 | 32 | Authorize to accept and expend $660,000 in State Fiscal Year 2017 of additional other funds available from the Department of Health and Human Services for the completion of Electronic Health Records. | $660,000 | approved |
| 05/03/17 | 33 | Authorize to enter into a sole source contract amendment with First Data Government Solutions, Cincinnati, OH (originally approved by G&C on 5-21-08, item #6), for support and maintenance of a proprie | $411,313 | approved |
| 05/03/17 | 34 | Authorize to enter into a sole source contract with Southwestern Community Services Inc., Keene, NH, for the Senior Energy Assistance Services Program, in the amount of $10,816. Effective May 3, 2017 | $10,816 | approved |
| 05/03/17 | 35 | Authorize to enter into a sole source contract with Community Action Partnership of Strafford County, Dover, NH, for the Senior Energy Assistance Services Program, in the amount of $5,038.52. Effectiv | $5,039 | approved |
| 05/03/17 | 36 | Authorize to enter into a sole source contract with Community Action Program Belknap-Merrimack Counties Inc., Concord, NH, for the Senior Energy Assistance Program, in the amount of $15,682. Effective | $15,682 | approved |
| 05/03/17 | 37 | Authorize to enter into a sole source contract with Tri-County Community Action Program Inc., Berlin, NH, for the Senior Energy Assistance Program, in the amount of $21,630. Effective May 3, 2017 thro | $21,630 | approved |
| 05/03/17 | 38 | Authorize to enter into a sole source contract with Southern NH Services Inc., Manchester, NH, for the Senior Energy Assistance Program, in the amount of $29,029. Effective May 3, 2017 through August | $29,029 | approved |
| 05/03/17 | 39 | Authorize to amend the Contract Attorney Program contracts (originally approved by G&C on 5-27-15, item #77), by increasing the total by $50,000 from $3,619,500 to $3,669,500 to allow qualified attorn | $3.7M | approved |
| 05/03/17 | 39A | Authorize to receive an additional appropriation from funds not otherwise appropriated in the total amount of $760,000. Effective July 1, 2016 through June 30, 2017. 100% General Funds. Fiscal Committ | $760,000 | approved |
| 05/03/17 | 40 | Authorize the Division of Agricultural Development to enter into an agreement with the Vital Communities to create and implement a regional marketing and education program to expend the purchase and c | $48,880 |
approved
Wheeler
|
| 05/03/17 | 41 | Authorize to transfer $1,054,000 among accounts. Effective upon G&C approval through June 30, 2017. 100% General Funds. Fiscal Committee approved. | $1.1M | |
| 05/03/17 | 42 | Authorize to transfer $6,656,400 among accounts to cover overtime shortfalls. Effective upon G&C approval through June 30, 2017. 100% General Funds. Fiscal Committee approved. | $6.7M | approved |
| 05/03/17 | 43 | Authorize to continue a 30% salary enhancement totaling $181,724.40 for position #19851, Chief Pharmacist, Labor Grade 30 and positions #12997, #19553 and #19848, Pharmacist, Labor Grade 27, for the p | $181,724 | approved |
| 05/03/17 | 44 | Authorize to amend a sub grant made available through the NH Department of Health and Human Services, Division of Community Based Care Services, Bureau of Drug and Alcohol Services (originally approve | $50,000 | approved |
| 05/03/17 | 45 | Authorize to amend an existing contract with AlfaPeople Incorporated, New York, NY (originally approved by G&C on 6-29-16, item #69), to allow for an upgrade in solution from Microsoft Dynamics AX to | $30.0M | approved |
| 05/03/17 | 46 | Authorize to budget and expend the prior year balance forward funds in the Safety Division’s Gas Pipeline Carriers accounting unit, in the amount of $55,000 which will be used to fund budget shortfall | $55,000 | approved |
| 05/03/17 | 47 | Authorize to enter into a sole source contract amendment with Raab Associates Ltd., Boston, MA (originally approved by the AG’s office on March 3, 2016), by increasing the amount by $10,000 from $100, | $110,000 | approved |