Item 5F
contract consent calendarMay 20, 2026
Description
Authorize the Bureau of Disability Determination Services to amend an existing contract with Surge Temps, LLC., Chandler, AZ (originally approved by G&C on 6/28/23, item #224, archived document ) by extending the end date from June 30, 2026 to June 30, 2027 with no change to the price limitation of $8,000,000, to provide employment services for the New Hampshire Disability Determination Service. Effective upon G&C approval. 100% Federal Funds
Amount
$8.0M
$8,000,000,
Department
DEPARTMENT OF EDUCATION
Funding Source
100% Federal Funds
Effective Dates
June 30, 2026 — June 30, 2027
Related Sub-Items (7)
5A
Authorize the Bureau of Highway Design to amend a contract with HDR Engineering, Inc., Bedford, NH (originally approved by G&C on 5/15/24, item #44, archived document ), for Preliminary engineering, e
5B
Authorize to amend an existing agreement with Sullivan County Health Care, Newport, NH (originally approved by G&C on 10/19/22, item #49A, archived document ), to extend the completion date from June
$25.2M
5C
Authorize to amend an existing agreement with White Mountain Community College, Berlin, NH (originally approved by G&C on 11/13/24, item #68, archived document ), to extend the completion date from Ju
$3.6M
5D
Authorize to amend a grant agreement to the City of Rochester, NH (originally approved by G&C 9/21/22, item #87, archived document ), by adjusting the scope of services for water system improvements,
5E
Authorize to amend an American Rescue Plan Act grant to Blaylock Holdings, LLC, Natick, MA (originally approved by G&C on 10/16/24, item #84, archived document ) by extending the grant end date from J
5G
Authorize to enter into a sole source amendment to an existing contract with Netsmart Technologies, Inc., Overland Park, KS (originally approved by G&C on 12/7/22, item #7, archived document ), to tra
$7.9M
5H
Authorize the New Hampshire State Conservation Committee to amend the grant agreement with The Nature Conservancy, Concord, NH, for the Durham Point Addition – Gsottschneider project in the Town of Du
$30,000
Documents (8)
Item_5A.pdf
(5A)
Open in new tab →
Item_5B.pdf
(5B)
Open in new tab →
Item_5C.pdf
(5C)
Open in new tab →
Item_5D.pdf
(5D)
Open in new tab →
Item_5E.pdf
(5E)
Open in new tab →
Item_5F.pdf
(5F)
Open in new tab →
Item_5G.pdf
(5G)
Open in new tab →
Item_5H.pdf
(5H)
Open in new tab →