Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 117 | $502.2M |
| R.S. Audley Inc. | 30 | $429.4M |
| Continental Paving Inc. | 83 | $373.5M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Severino Trucking Co Inc. | 1 | $67.1M |
| E.D. Swett Inc. | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,572 | $4.21B |
| other | 1,466 | $3.45B |
| grant | 215 | $290.6M |
| transfer | 173 | $311.3M |
| nomination | 117 | $109.2M |
| amendment | 107 | $331.5M |
| lease | 102 | $25.2M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 12 | $5.7M |
| settlement | 4 | $5.0M |
| expenditure | 2 | $46,329 |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 04/23/25 | #26 | Authorize the Bureau of Right-of-Way to sell approximately 35.38+/- acres of State-owned land located on the southerly side of Monadnock Street, in the Town of Troy, NH to Douglas Sappala, for $145,00 | $145,000 | approved | |
| 04/23/25 | #27 | Authorize the Bureau of Right-of-Way to sell approximately 0.077+/- acres of unimproved State-owned land, located northeasterly of NH Route 11 (Lake Shore Road), and south of the Belknap Point Road in | $61,400 | approved | |
| 04/23/25 | #28 | Authorize the Bureau of Mechanical Services to purchase dump bodies for trucks utilized for summer and winter maintenance, including snow and ice removal, on state-maintained roadways from H.P. Fairfi | $607,259 | approved | |
| 04/23/25 | #29 | Authorize the Bureau of Highway Design to enter into an agreement with Fuss & O’Neill, Manchester, NH, for an amount not to exceed $3,000,000, for on-call survey and utility services during the design | Fuss & O’Neill | $3.0M | approved |
| 04/23/25 | #30 | Authorize the Bureau of Highway Design to enter into an agreement with Haley & Aldrich, Inc., Bedford, NH, for an amount not to exceed $3,000,000, for on-call geotechnical engineering services associa | Haley & Aldrich, Inc. | $3.0M | approved |
| 04/23/25 | #31 | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt, LLC, Belmont, NH, on the basis of a low bid of $3,285,679.22 for pavement resurfacing of Tier 2, 3 and 4 roadways in ele | GMI Asphalt, LLC | $3.3M | approved |
| 04/23/25 | #32 | Authorize the Bureau of Construction to enter into a contract with Berg Contracting & Construction, LLC, Fitzwilliam, NH, on the basis of a low bid of $331,081.75 for slope stabilization work on NH 12 | Berg Contracting & Constructio | $331,082 | approved |
| 04/23/25 | #33 | Authorize the Bureau of Construction to enter into a contract with Continental Paving, Inc., Londonderry, NH, on the basis of a low bid of $2,769,346.98 for resurfacing of twelve sections of various T | Continental Paving, Inc. | $2.8M | approved |
| 04/23/25 | #34 | Authorize the Bureau of Construction to enter into a contract with Pike Industries, Inc., Belmont, NH, on the basis of a low bid of $5,950,648.75 for resurfacing of thirteen sections roadways through | Pike Industries, Inc. | $6.0M | approved |
| 04/23/25 | #35 | Authorize to exercise a renewal option to an existing contract with New Hampshire Association for the Blind, Trade Name Future In Sight, Concord, NH (originally approved by G&C on 5/3/23, Item #45) fo | New Hampshire Association for | $362,012 |
denied
Kenney, Liot Hill, Stevens, Stephen, Wheeler
|
| 04/09/25 | #21 | Authorize the Bureau of Right-of-Way to pay property owners $102,900 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extending from February 19, 2025 thro | $102,900 | approved | |
| 04/09/25 | #22 | Authorize the Bureau of Right-of-Way to pay property owners $548,720 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extending from March 13, 2025 through | $548,720 | approved | |
| 04/09/25 | #23 | Authorize the Bureau of Right-of-Way to sell a parcel of State-owned Land to Collin P. Snide and Nicole M. Snide for $54,000 and assess an additional administrative fee of $1,100. The Parcel, consisti | $54,000 | approved | |
| 04/09/25 | #24 | Authorize the Bureau of Environment to enter into an Agreement with Hunter Research, Inc., Trenton, NJ, in the amount of $250,000, to provide on-call architectural history services for various project | Hunter Research, Inc. | $250,000 | approved |
| 04/09/25 | #25 | Authorize the Bureau of Environment to enter into an Agreement with Lisa Mausolf, Preservation Consultant, Reading, MA, in the amount of $250,000, to provide on-call architectural history services for | Lisa Mausolf, Preservation Con | $250,000 | approved |
| 04/09/25 | #26 | Authorize the Bureau of Environment to enter into an Agreement with NHPresCo, LLC, d/b/a Preservation Company, Kensington, NH, in the amount of $250,000, to provide on-call architectural history servi | NHPresCo, LLC, d/b/a Preservat | $250,000 | approved |
| 04/09/25 | #27 | Authorize the Bureau of Rail & Transit to transfer to the Department of Natural and Cultural Resources management of Conway Branch Railroad Line, state-owned abandoned railroad corridor for management | approved | ||
| 04/09/25 | #28 | Authorize the Bureau of Rail and Transit to enter into a lease agreement with East Bluff Highlands Association/Eastbluff Village Condominium, in the amount of $2,078.26 for the use of state-owned prop | $2,078 | approved | |
| 04/09/25 | #29 | Authorize the Bureau of Construction to enter into a contract with Kirk Fenoff & Son Excavating, LLC, Danville, VT, on the basis of a low bid of $1,013,144.89 for replacement of a concrete box culvert | Kirk Fenoff & Son Excavating, | $1.0M | approved |
| 04/09/25 | #30 | Authorize the Bureau of Highway Design to enter into an Agreement with Stantec Consulting Services, Inc., Auburn, NH, for an amount not to exceed $1,000,000, for contaminated and hazardous materials s | Stantec Consulting Services, I | $1.0M | approved |
| 04/09/25 | #31 | Authorize the Bureau of Highway Design to enter into an Agreement with Haley & Aldrich, Inc., Bedford, NH, for an amount not to exceed $500,000, for contaminated and hazardous materials for various tr | Haley & Aldrich, Inc. | $500,000 | approved |
| 04/09/25 | #32 | Authorize the Bureau of Highway Design to enter into a grant agreement with Gridwealth EV LLC, Sudbury, MA, for an amount not to exceed $613,952 for installation of electric vehicle charging state in | Gridwealth EV LLC | $613,952 | approved |
| 04/09/25 | #33 | Authorize the Bureau of Highway Design to enter into a grant agreement with Gridwealth EV LLC, Sudbury, MA, for an amount not to exceed $619,952 for installation of electric vehicle charging state in | Gridwealth EV LLC | $619,952 | approved |
| 04/09/25 | #34 | Authorize the Bureau of Highway Design to amend a sole source contract with Vanasse Hangen Brustlin, Inc., Bedford, NH, for intersection improvements in the Town of Jaffrey, NH, by increasing the fee | Vanasse Hangen Brustlin, Inc. | $3.1M | approved |
| 04/09/25 | #35 | Authorize the Bureau of Highway Design to enter into certain sole source Special, Supplemental, and Account Agreements (and their amendments) with utilities, municipalities, and railroad entities that | approved | ||
| 04/09/25 | #36 | Authorize the Bureau of Highway Design to amend a contract with McFarland-Johnson, Inc., Concord, NH (originally approved by G&C on 9/30/18, Item #30), for preliminary design of improvements to a five | McFarland-Johnson, Inc. | $1.7M | approved |
| 04/09/25 | #37 | Authorize to accept and place on file the Bureau of Highway Design’s summary report of agreements paid through the fiscal year ending June 30, 2024. | approved | ||
| 03/26/25 | #22 | Authorize the Division of Operations to transfer $4,295,000 from the Highway Surplus Account to fund winter maintenance activities. Effective upon G&C approval through June 30, 2025. 100% Highway Fund | $4.3M | approved | |
| 03/26/25 | #23 | Authorize the Bureau of Right-of-Way to pay property owners $217,780 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extending from February 6, 2025 throu | $217,780 | approved | |
| 03/26/25 | #24 | Authorize the Bureau of Traffic to enter into a sole source agreement with the Southern New Hampshire Planning Commission, in the amount of $60,000 to provide services for developing, integrating, and | Southern New Hampshire Plannin | $60,000 | approved |
| 03/26/25 | #25 | Authorize the Bureau of Traffic to enter into a sole source agreement with CLR Analytics Inc., Irvine, CA, in the amount of $700,000. This SMART (Strengthening Mobility and Revolutionizing Transportat | CLR Analytics Inc. | $700,000 | approved |
| 03/26/25 | #26 | Authorize the Bureau of Traffic to enter into a sole source agreement with the University of Massachusetts Lowell, in the amount of $180,000 to provide services for developing, integrating, and deploy | University of Massachusetts Lo | $180,000 | approved |
| 03/26/25 | #27 | Authorize the Bureau of Traffic to enter into a sole source agreement with Applied Research Associates, Inc., Albuquerque, NM, in the amount of $23,596. This State Transportation Innovation Council gr | Applied Research Associates, I | $23,596 | approved |
| 03/26/25 | #28 | Authorize the Bureau of Aeronautics to retroactively provide funding to the Nashua Airport Authority, in the amount of $184,015, to acquire land in fee simple (approximately 0.58 acres; Map E Lot 50) | $184,015 | approved | |
| 03/26/25 | #29 | Authorize the Bureau of Construction to increase the contract value amount with Evroks Corporation, Northfield, NH, by $217,000 from $1,437,286.35 to $1,654,286.35, for bridge preservation in Lee, NH. | $1.7M | approved | |
| 03/26/25 | #30 | Authorize the Bureau of Construction to enter into a contract with Dagle Electrical Construction Corp., Wilmington, MA, on the basis of a low bid of $1,538,351 for construction of permanent Weigh-in-M | Dagle Electrical Construction | $1.5M | approved |
| 03/26/25 | #31 | Authorize the Bureau of Highway Design to enter into an Agreement with Sanborn, Head & Associates, Inc., Bedford, NH, for an amount not to exceed $1,000,000, for contaminated and hazardous materials s | Sanborn, Head & Associates, In | $1.0M | approved |
| 03/26/25 | #32 | Authorize the Bureau of Highway Design to enter into an Agreement with Jacobs Engineering Group, Inc., Bedford, NH, for an amount not to exceed $1,646,194.60, for improvements to NH101A (Amherst Stree | Jacobs Engineering Group, Inc. | $1.6M | approved |
| 03/26/25 | #32A | Authorize the Bureau of Highway Maintenance to hold an organized Safety Plow Rally meeting on May 22, 2205, at Pawtuckaway State Park, Nottingham, NH for a total cost not to exceed $18,000 for the pur | $18,000 | approved | |
| 03/12/25 | #23 | Authorize the Bureau of Human Resources to retroactively pay employees, an amount not to exceed $71,130.35 for compensation owed to them due to SOC classification issues from November 3, 2023. Effecti | $71,130 | approved | |
| 03/12/25 | #24 | Authorize the Bureau of Human Resources to enter into a retroactive sole source agreement with Federal Highway Administration Finance Division, National Highway Institute, Arlington, VA, for an amount | Federal Highway Administration | $221,295 | approved |
| 03/12/25 | #25 | Authorize the Bureau of Right-of-Way to pay property owners $56,900 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extending from January 30, 2025 throug | $56,900 | approved | |
| 03/12/25 | #26 | Authorize the Bureau of Right-of-Way to pay property owners $103,425 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extending from January 1, 2025 throug | $103,425 | approved | |
| 03/12/25 | #27 | Authorize to accept and place on file the Bureau of Right-of-Way’s Contemplated Awards List for amounts less than $5,000, for a total of $35,895 for the period extending from October 1, 2024 through D | $35,895 | approved | |
| 03/12/25 | #28 | Authorize the Bureau of Construction to enter into a contract with Electric Light Co., Inc. d/b/a Electric Signal Repair, Cape Neddick, ME, on the basis of a low bid of $387,100 for statewide installa | Electric Light Co., Inc. d/b/a | $387,100 | approved |
| 03/12/25 | #29 | Authorize the Bureau of Transportation Systems Management & Operations to exercise a contract renewal option with Green Mountain Communications, Inc., Pembroke, NH (originally approved by G&C on 5/17/ | $1.1M | approved | |
| 03/12/25 | #30 | Authorize the Bureau of Highway Design to retroactively amend the contract with Hoyle, Tanner & Associates, Inc., Manchester, NH (originally approved by G&C on 1/8/20, Item #13), for US 202 Bridge Rep | Hoyle, Tanner & Associates, In | approved | |
| 03/12/25 | #31 | Authorize the Bureau of Highway Design to retroactively amend the contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 9/26/20, Item #27), for preliminary design of impro | HDR Engineering, Inc. | approved | |
| 03/12/25 | #31A | Authorize the Bureau of Mechanical Services to purchase hitches and hydraulics for trucks utilized for summer and winter maintenance, including snow and ice removal on state highways and interstates f | $680,465 | approved | |
| 02/26/25 | #20 | Authorize the Bureau of Turnpikes to transfer $300,000 between various accounts and classes in Turnpike’s Central Maintenance and Turnpike’s Toll Collection in order to pay for services incurred in me | $300,000 | approved |