Meetings / May 20, 2026 / Item 16

Item 16

contract

May 20, 2026

Description

Authorize the Bureau of Bridge Maintenance to enter into a contract based on a single hourly rate bid with Northeast Integration, LLC, North Hampton, NH in the amount of $75,000 to provide all labor, materials, equipment and transportation necessary to perform programmable logic controller services, for the State of New Hampshire, Department of Transportation for work that includes maintenance, repairs, and system upgrades to control systems for the Sarah Mildred Long Bridge, the Memorial Bridge, and Various Bridges statewide. Effective upon G&C approval through June 30, 2029. 69% Highway Funds, 31% Other Funds

Amount
$75,000
$75,000
Funding Source
69% Highway Funds; 31% Other Funds

Documents (1)

Item_16.pdf Open in new tab →
← Back to May 20, 2026 meeting