Meetings / Jan 12, 2022 / Item 30

Item 30

approved amendment

Jan 12, 2022

Description

Authorize the Bureau of Bridge Design to amend the Interstate Bridge Agreement with the State of Vermont (originally approved by G&C on 3-6-13, item #45), which allows the Department to bill Vermont for costs associated with rehabilitation of the bridge carrying East Thetford Road over the Connecticut River (NH Br. No. 053/112 and Connecticut River Br. No. 14) between the Towns of Lyme, NH and Thetford, VT, effective upon G&C approval, and continuing through engineering design, construction, inspection, and final acceptance of the completed project, in accordance with the Department’s 10-Year Transportation Improvement Plan. The amendment modifies Section 2.d Construction Costs and Section 3 Application of Federal Grants of the previously approved agreement to reflect the more precise cost sharing determination of 86% by NH and 14% by VT.

Funding Source
86% by NH and; 14% by VT
Vote Record approved
Motion by Stevens, seconded by Kenney acted as follows
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_30.pdf Open in new tab →
← Back to Jan 12, 2022 meeting