Meetings / Aug 28, 2019 / Item 27B

Item 27B

approved amendment late item

Aug 28, 2019

Description

Authorize the Bureau of Bridge Design to amend the Interstate Bridge Agreement with the State of Maine to allow the Department to reimburse Maine for NH’s portion of the increased construction costs and claim settlement costs totaling $9,500,000 (NH portion = $4,067,500) associated with the replacement of the Sarah Mildred Long Bridge (NH Br. No. 251-110) carrying US 1 Bypass over the Piscataqua River between Portsmouth, NH and Kittery, ME. Effective upon G&C approval and continuing through construction, inspection and final acceptance of the completed project. 43% NH 57% ME.

Amount
$9.5M
$9,500,000, $4,067,500
Funding Source
43% NH; 57% ME
Vote Record approved
Michael Cryans (D) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Ted Gatsas (R) yes
Debora Pignatelli (D) yes
Related Sub-Items (4)

Documents (5)

Item_27.pdf Open in new tab →
Item_27A.pdf (27A) Open in new tab →
Item_27B.pdf (27B) Open in new tab →
Item_27C.pdf (27C) Open in new tab →
Item_27D.pdf (27D) Open in new tab →
← Back to Aug 28, 2019 meeting