Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 117 | $502.2M |
| R.S. Audley Inc. | 30 | $429.4M |
| Continental Paving Inc. | 83 | $373.5M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Severino Trucking Co Inc. | 1 | $67.1M |
| E.D. Swett Inc. | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,577 | $4.22B |
| other | 1,470 | $3.45B |
| grant | 216 | $290.7M |
| transfer | 175 | $317.8M |
| nomination | 117 | $109.2M |
| lease | 108 | $25.4M |
| amendment | 107 | $331.5M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 12 | $5.7M |
| settlement | 4 | $5.0M |
| expenditure | 2 | $46,329 |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 10/02/13 | #85 | Authorize the Bureau of Right of Way to sell a 0.21+/- of an acre portion of the NH Route 111 Limited Access Right of Way located on the southeast corner of NH Route 28 and NH Route 111 in the Town of | $23,100 | approved | |
| 10/02/13 | #86 | Authorize the Bureau of Right of Way to sell a 4.4+/- acre parcel of State owned land located at the corner of Radburn Street, Smyth Road, and Mammoth Road, also located on the easterly side of Inters | $135,000 | approved | |
| 10/02/13 | #87 | Authorize the Bureau of Environment to pay the Department of Environmental Services Aquatic Resource Mitigation Fund $43,697.72. Effective upon G&C approval through June 30, 2014. 100% Agency Income ( | $43,698 | approved | |
| 10/02/13 | #88 | Authorize to accept and place on file the Bureau of Construction’s quarterly report of active projects that may require contingency use, for the period through August 31, 2013. | approved | ||
| 10/02/13 | #89 | Authorize the Bureau of Construction to amend a contract with A.B. Logging Inc., Lancaster, NH, (originally approved by G&C on 6-19-13, item #237), for the construction of a new scenic overlook with v | A.B. Logging Inc. | $879,870 | approved |
| 10/02/13 | #90 | Authorize the Bureau of Construction to amend a contract with S.U.R. Construction Inc., Rochester, NH, (originally approved by G&C on 6-5-13, item #209), for the emergency repair of two failing draina | S.U.R. Construction Inc. | $572,762 | approved |
| 10/02/13 | #91 | Authorize the Bureau of Construction to enter into a contract with Surface Preparation Technologies LLC, Mechanicsburg, PA, for milling rumble strips in the shoulders and along the centerline of NH Ro | Surface Preparation Technologi | $219,840 | approved |
| 10/02/13 | #92 | Authorize the Bureau of Construction to enter into a contract with SRS Petroleum Services Corp., Bridgewater, MA, for new fueling facility and removing the existing fueling facility at the Kinston Pat | SRS Petroleum Services Corp. | $312,450 | approved |
| 10/02/13 | #93 | Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for the reconstruction and realignment of NH Route 110 through the City of Berlin, on the ba | Alvin J. Coleman & Son Inc. | $4.1M | approved |
| 10/02/13 | #94 | Authorize the Bureau of Materials & Research to enter into a sole source agreement with Worcester Polytechnic Institute, Worcester, MA, for testing services with a Falling Weight Deflectometer van and | Worcester Polytechnic Institut | $10,000 | approved |
| 10/02/13 | #95 | Authorize the Bureau of Traffic to enter into a contract with Green Mountain Communications Inc., Pembroke, NH, for the purpose of providing Statewide intelligent transportation systems field-device r | Green Mountain Communications | $193,950 | approved |
| 10/02/13 | #27C | TABLED – The Governor and Council on motion of Councilor Van Ostern, seconded by Councilor Pignatelli voted to table the request to sell the State-owned land, buildings, and other improvements located | $95,000 | approved | |
| 10/02/13 | #27D | TABLED – The Governor and Council on motion of Councilor Van Ostern, seconded by Councilor Pignatelli voted to table the request to sell the State-owned land, buildings, and other improvements located | $95,000 | approved | |
| 09/18/13 | #69 | Authorize the Bureau or Right of Way to pay various owners $31,160 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from August 14, 2013 through A | $31,160 | approved | |
| 09/18/13 | #70 | Authorize the Bureau of Right of Ways petition for a hearing on alterations to US 1 in the Town of Seabrook. A Commission should be appointed to hold a hearing, and, if necessity is found, to layout t | $2,857 | approved | |
| 09/18/13 | #71 | Authorize the Bureau of Aeronautics to award a grant to the City of Lebanon, AIP-49, to conduct an environmental assessment, permitting and mitigation for the removal of obstructions at the Lebanon Mu | City of Lebanon, AIP-49, to co | $546,630 | approved |
| 09/18/13 | #72 | Authorize the Bureau of Construction to enter into a contract with Stephens Marquis Associates Inc., Merrimack, NH, for new fueling facility and removing the existing fueling facility at the Strafford | Stephens Marquis Associates In | $561,100 | approved |
| 09/18/13 | #73 | Authorize the Bureau of Environment to enter into two individual agreements with the firms of ATC Group Services Inc., Manchester, NH, and Stantec Consulting Services Inc., Auburn, NH, for hazardous m | $400,000 | approved | |
| 09/18/13 | #74 | Authorize the Bureau of Construction to enter into a contract with CPM Constructors Inc., Freeport, ME, for replacement of the existing US 4 bridge across the Connecticut River located between the Cit | CPM Constructors Inc. | $10.6M | approved |
| 09/18/13 | #75 | Authorize the Bureau of Construction to enter into a contract with Severino Trucking Co. Inc., Candia, NH, for replacement of 4 red list bridges, and the rehabilitation of 1 red list bridge located at | Severino Trucking Co. Inc. | $26.2M | approved |
| 09/18/13 | #76 | Authorize the Bureau of Construction to enter into a contract with S.U.R Construction Inc., Rochester, NH, for roadway rehabilitation and widening on NH 28 at its intersection with Stockbridge Corner | S.U.R Construction Inc. | $1.5M | approved |
| 09/18/13 | #77 | Authorize the Bureau of Rail & Transit to enter into a Loan Agreement with the Mount Washington Railway, Base Station Road, Mount Washington, NH, for the installation of additional track supports and | Mount Washington Railway, Base | $477,000 | approved |
| 09/18/13 | #78 | Authorize the Bureau of Rail & Transit to enter into a Loan Agreement with the Mount Washington Railway, Base Station Road, Mount Washington, NH, for the construction of a diesel locomotive, in an amo | Mount Washington Railway, Base | $750,000 | approved |
| 09/18/13 | #79 | Authorize the Bureau of Rail & Transit to amend a sole source agreement with Trapeze Software Group Inc., Scottsdale, AZ, (originally approved by G&C on 11-17-10, item #216), for support of the tri-st | Trapeze Software Group Inc. | $193,835 | approved |
| 09/04/13 | #94 | Authorize the Bureau of Right of Way to pay various owners $366,800 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from July 24, 2013 through Au | $366,800 | approved | |
| 09/04/13 | #95 | Authorize the Bureau of Right of Way to sell a historic 1 ½ story, wood-frame house, which requires removal from state owned property located at 19 Prospect Street (US Route 3) in the Town of Lancaste | $500 | approved | |
| 09/04/13 | #96 | Authorize the Bureau or Rail and Transit to sell a 1.01 +/- acre parcel of State owned land located on the Manchester and Lawrence Railroad corridor in the Town of Windham to the Town of Windham for $ | $7,000 | approved | |
| 09/04/13 | #97 | Authorize the Bureau of Rail and Transit to enter into an agreement with Transport Central, Plymouth, NH, for coordinated transportation services for elderly persons and persons with disabilities in a | Transport Central | $53,200 | approved |
| 09/04/13 | #98 | Authorize the Bureau of Aeronautics to award a grant to the City of Manchester, for AIP-95 for the design of the relocation of an airport interior road outside of the runway Object Free Area at the Ma | $277,875 | approved | |
| 09/04/13 | #99 | Authorize the Bureau of Aeronautics to amend a grant to the City of Lebanon, NH, (originally approved by G&C on 9-9-09, item #125), for AIP-42, to implement the second phase of an Environmental Assess | City of Lebanon, NH, (original | approved | |
| 09/04/13 | #100 | Authorize the Bureau of Aeronautics to award a grant to the City of Manchester, for AIP-94, to reconstruct a portion of the airport’s terminal apron and to make improvements to two taxiways at the Man | $4.3M | approved | |
| 09/04/13 | #101 | Authorize the Bureau of Aeronautics to retroactively amend a grant to the City of Lebanon, NH, (originally approved by G&C on 8-22-07, item #286), for AIP-34, to conduct an Airport Master Plan Update | approved | ||
| 09/04/13 | #102 | Authorize the Bureau of Aeronautics to provide funding to the Pease Development Authority for SBG-15-04-2012, to design and permit the reconstruction, 200 foot extension, mark, light and sign of Runwa | $538,673 | approved | |
| 09/04/13 | #103 | Authorize the Bureau of Aeronautics to enter into an agreement with McFarland-Johnson Inc., Concord, NH, and Binghamton, NY, for on-call aviation planning, engineering, and technical support services | McFarland-Johnson Inc. | $950,000 | approved |
| 09/04/13 | #104 | Authorize the Bureau of Aeronautics to provide funding to the Pease Development Authority, for SBG-16-02-0213, Phase 1 efforts to restore airfield pavement and drainage systems that have been damaged | $2.0M | approved | |
| 09/04/13 | #105 | Authorize the Bureau of Aeronautics to provide funding to the Pease Development Authority for SBG-16-01-0213 to conduct a facility needs analysis at the Portsmouth International Airport at Pease, in t | $73,625 | approved | |
| 09/04/13 | #106 | Authorize the Bureau of Aeronautics to provide funding to the City of Keene, NH, for SBG-08-11-2013, to conduct an environmental assessment of obstructions to the Runway 20 approach surfaces at the Di | $145,350 | approved | |
| 09/04/13 | #107 | Authorize the Bureau of Construction to enter into a contract with R.M. Piper Inc., Plymouth, NH, for slope stabilization on NH Route 10 in Haverhill, on the basis of a low bid of $1,109,102.75. (2)Fu | R.M. Piper Inc. | $1.1M | approved |
| 09/04/13 | #108 | Authorize the Bureau of Construction to enter into a retroactive contract with R.S. Audley Inc., Bow, NH, for emergency roadway repair on NH 12A (Alstead Center Road) approximately 700 feet north of t | R.S. Audley Inc. | $1.8M | approved |
| 09/04/13 | #109 | Authorize the Bureau of Construction to enter into a contract with Surface Preparation Technologies LLC, Mechanicsburg, PA, for milling rumble strips in the shoulders and along the centerlines at vari | Surface Preparation Technologi | $201,310 | approved |
| 09/04/13 | #110 | Authorize the Bureau of Construction to enter into a contract with Delucca Fence Company Inc., Belmont, NH, for replacement of approximately 100 terminal “F” guardrail end units at various locations, | Delucca Fence Company Inc. | $863,998 | approved |
| 09/04/13 | #111 | Authorize the Bureau of Aeronautics to award a grant to the City of Berlin to construct the replacement Jet-A fuel farm at the Berlin Regional Airport, in the amount of $329,175. Effective upon G&C ap | $329,175 | approved | |
| 08/14/13 | #87 | Authorize the Bureau of Right of Way to pay various owners $57,150 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from July 4, 2013 through July | $57,150 | approved | |
| 08/14/13 | #88 | Authorize the Bureau of Right of Way to sell a 20+/- acre parcel of State owned land located on the northerly side of NH Route 10 in the Town of Piermont to Yaroslav Frimerman and Elena Selioukova for | $7,700 | approved | |
| 08/14/13 | #89 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Wragg Brothers of Vermont Inc., Ascutney, VT, for a 6-inch drilled well and pump on the property of Steve Gagno | Wragg Brothers of Vermont Inc. | $23,000 | approved |
| 08/14/13 | #90 | Authorize the Bureau of Highway Design to amend an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, (originally approved by G&C on 3-7-12, item #84), to perform a system planning study to exa | Vanasse Hangen Brustlin Inc. | approved | |
| 08/14/13 | #91 | Authorize the Bureau of Materials & Research to enter into an agreement with Terracon Consultants Inc., Manchester, NH, for the purpose of providing on-call Statewide Bridge Deck Condition Surveys, fo | Terracon Consultants Inc. | $250,000 | approved |
| 08/14/13 | #92 | Authorize the Bureau of Mechanical Services to enter into a contract with North American Equipment Upfitters Inc., Hooksett, NH, for providing Aerial Lift Inspection repair, scheduled service and unsc | North American Equipment Upfit | $123,580 | approved |
| 08/14/13 | #93 | Authorize to accept and place on file the Bureau of Construction’s quarterly basis summary of active projects that may require contingency use, for the period through June 30, 2013. | approved | ||
| 08/14/13 | #94 | Authorize the Bureau of Traffic to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, and Watertown, NY, to develop and implement optimized traffic signal timing plans for approxi | Vanasse Hangen Brustlin Inc. | $264,839 | approved |